Bathrooms/Showers
We did the floors, walls, cabinets, tile, showers , plumbing, etc. in these photos.
 
 
The first one is the before shot of the bathroom in the next two photos. It was basement storage originally. We had to install a sump pump for drainage first, then a waste pump for septic.
 
 
We didn't do the glass block
 
 
 
 
 
We did do the floors, too
 
 
 
We did everything but the wall paper here, including moving that window.
 
 
Click!
 
 
 
Shower with two heads on opposing walls at differing heights for a tall husband and a short wife.
 
 
Here, we added a full bath to a large bedroom.
Before and after. Click for the full view.
 
 
Tub to shower conversion
 
 
 
New master bathroom
 
 
 
New guest bathroom
 
 
 
New bathroom - before
 
 
 
New bathroom - after
 
 
 
New bathroom. Note that the shower was tiled with just four tiles (500 pounds!) and we also bent the flooring down over the risers on the steps.